For this project, it was necessary to construct a timeline and budget. The timeline created, which is pictured below in Table 1, is set up as a guide for the group to follow while the project is being constructed. It is ideal for the group to complete each task within the time frame set forth; however, the deliverables for each can be altered if a complication arrises. In addition to the timeline, the budget is also pictured below in Table 2. It can be seen that the total cost to create this project is relatively low; the reason for this is that the Innovation Studio and some of the engineering labs were able to supply the group with the majority of the supplies needed.